Happy enterprise, transmitting positive energy
Like warm sunshine, illuminating every corner and allowing every effort to continue shining brightly!
GuangDong VICTOR Industry co,. Ltd has an annual output of 1.5 million pieces of electronic consumer parts and 400,000 pieces of the renovation and expansion project
Addtime: 2024-11-08
Clicks:430
Go Back Project Publicity

GuangDong VICTOR Industry co,. Ltd has an annual output of 1.5 million pieces of electronic consumer parts and 400,000 pieces of the renovation and expansion project


GuangDong VICTOR Industry co,. Ltd has an annual output of 1.5 million pieces of electronic consumer parts and 400,000 pieces of the renovation and expansion project

 

GuangDong VICTOR Industry co,. Ltd. commissioned Guangdong Xinkui Green Environment Consulting Co., Ltd. to undertake the GuangDong VICTOR Industry co,. Environmental impact assessment of Ltds annual output of 1.5 million pieces of electronic consumer goods spare parts and 400,000 pieces of automobile interior and exterior accessories. In accordance with the relevant provisions of the Environmental Impact Assessment Law of the Peoples Republic of China and the Measures for Public Participation in Environmental Impact Assessment, the following information shall be announced to the public:

1. Name and outline of the construction project

GuangDong VICTOR Industry co,. Ltd plans to invest 50 million yuan to rebuild and expand the existing workshop in the existing factory, add CNC, die casting machine and other equipment, increase the use of the existing 1 # painting line, and build the existing approved and use low VOCS content solvent coating. The annual production is 700,000 pieces of speaker handles, 200,000 pieces of microphone sleeves, 450,000 pieces of speaker flat iron mesh, 150,000 pieces of speaker base, and 400,000 pieces of car interior and exterior accessories.

2. An overview of the construction project

(1) Wastewater: mainly for new employee domestic sewage, new skim wastewater, cleaning wastewater, acid etching wastewater, passivation wastewater, electrophoresis wastewater in renovation and expansion projects, etc.;

(2) Waste gas: mainly metal dust produced by aluminum melting; organic waste gas from die casting; particulate matter from sandblasting and grinding; acid fog exhaust gas from acid etching; organic waste gas from spray painting and leveling; organic waste gas and combustion waste gas, etc.;

(3) Noise: it mainly comes from the noise generated during the operation of all kinds of production equipment;

(4) Solid waste: mainly aluminum ash and slag, machining scraps, waste activated carbon, waste oil and household garbage, etc.

3. Countermeasures and measures to prevent or mitigate adverse effects

(1) Waste gas: the metal dust produced by aluminum is treated by the existing treatment facilities "water rotary integrated dust processor + fog tower"; die-casting waste gas is treated by the existing treatment facilities "water rotary integrated dust processor + fog tower"; acid etching waste gas is treated by the existing treatment facilities "alkali spray" device; spray painting, painting, leveling, curing waste gas and drying waste gas after electrophoresis are treated by adding "zeolite runner + RTO".

The air pollutants discharged after the project is put into use will not have significant adverse effects on the ambient air quality and environmental sensitive points.

(2) Wastewater:. The wastewater generated in this project has no obvious impact on the surface water.

(3) Noise: the project should choose low noise equipment as far as possible, the mechanical equipment should take noise elimination and vibration reduction measures, etc., and then through the sound insulation and distance attenuation of the building structure in the factory, it is expected that the noise generated by the mechanical equipment during the operation period will have no obvious impact on the surrounding environment;

(4) Solid waste: the solid waste generated by the renovation and expansion project includes household garbage, metal scraps, packaging barrels of raw materials of wastewater coatings, raw materials of waste solvent-based coatings, aluminum ash and slag, waste oil and waste activated carbon. Household waste shall be treated by the local sanitation department; general solid waste such as metal scraps and wastewater coatings shall be stored in the general solid waste warehouse of the existing projects and be disposed regularly by the relevant units; hazardous waste such as raw materials, aluminum ash, waste oil and waste activated carbon shall be stored in the existing projects, and regularly handled by qualified units. The solid waste generated by the renovation and expansion project will not have a significant impact on the surrounding environment.

4. Conclusion of the environmental impact assessment

GuangDong VICTOR Industry co,. The site selection of Ltd's annual output of 1.5 million pieces of electronic consumer goods spare parts and 400,000 pieces of auto interior and exterior accessories renovation and expansion project is in line with the local environmental planning and local regional overall planning, and the environmental capacity permit, production process and scale of the region are in line with the requirements of national and local industrial policies. During the operation of the project, there will be some waste gas, waste water, solid waste and noise pollution. On the basis of implementing the suggestions on pollution prevention and control put forward in this evaluation report, strengthen the environmental management and pollution monitoring system, ensure the long-term and stable operation of pollution prevention and control facilities and eliminate accident emissions, the impact on the environment is small and will not cause serious environmental pollution. Therefore, from the perspective of environmental protection, the construction of the reconstruction and expansion project is feasible.

5. Main matters to solicit public opinion

To solicit opinions and suggestions from relevant units, residential (village) committee and the masses on the construction of the project.

(1) The current situation of the surrounding environment of the construction project and the main environmental problems that the public worries about, and the possible impact of the project construction on the surrounding environment;

(2) Opinions and requirements of the public on the construction units in pollution prevention and control;

(3) From the perspective of environmental protection, the public's attitude towards the construction of the project;

(4) Suggestions on the environmental protection of the project.

Note: According to the Measures for Public Participation in Environmental Impact Assessment, opinions or demands related to project EIA, including land expropriation, demolition, property and employment, do not belong to the public participation of project EIA

Public Participation in environmental Impact Assessment

HTTP://WWW.MEE.GOV.CN/XXGK2018/XXGK/XXGK01/201810/T20181024_665329.HTML。

Full text of the draft for Comments:

HTTPS://PAN.BAIDU.COM/S/1QTYTHQBWV3WRDA_6BCSOXW

Extraction code: HD8X

The paper version can be consulted by contacting the eia unit.

VI. The main means of raising the publics opinions

This publicity mainly takes the form of online publicity and newspaper publication, and announces to the public. The valid period of the announcement is from November 8,2024 to November 21,2024, a total of 10 working days. If you have any comments and opinions on the project, please give feedback to the construction unit or the environmental impact assessment unit within the validity period of the announcement. Comments can be sent by filling in a public comment form or by mail (with the date of the postmark). Please ndicate the date of publication, real name and contact information while expressing your comments, so that we can timely feedback the relevant information.

7. Name and contact information of the construction unit

Construction unit: GuangDong VICTOR Industry co,. Ltd

Contact person: Mr.Chen

Contact number: 18688602816

8. Name and contact information of the environmental impact assessment agency

Eia unit: Guangdong Xinkui Green Environment Consulting Co., Ltd

Address: 14th floor, Weifeng Commercial Plaza, Nubmer.19, Jianshe Third Road, Pengjiang District, Jiangmen City

Contact person: Deng Gong Tel.: 0750-3088227

postbox:1376448505@QQ.COM

 

Construction unit: GuangDong VICTOR Industry co,. Ltd

On November 8,2024

 

 


Copyright © VICTOR ALUMINUM USA BUSINESS OFFICE  

Technical Support: